All Finished, and ready for a final inspection by Getzger
No doubt Getzger is looking for snakes (don’t tell him but we found one in here when we cleared the garage out).
Here’s how the work progressed:
May 26. The new garage window was installed. In the background is the new shelf unit along with a tent in the throws of being treated with silicon water-proofing.
June 14. The window is finished except for the trim. There are two coats of paint on the wall, and just one more coat to go. Ginger did most of the work painting and putting the film on the window, and Alek helped with the first coat of paint.
June 15. The wall is all painted, and the shelves are in place. I just need to fit a couple more feet to sheet material shelf (the big long one), a couple of brackets to the top shelf, fit the garden tool pegboard and a holder for my fishing rods, and it will be done.
Copyright © 2010 Gary Allman, all rights reserved.