All Finished, and ready for a final inspection by Getzger

All finished and ready for inspection by Getzger who, no doubt is looking for snakes. Copyright © 2010 Gary Allman, all rights reserved.

No doubt Getzger is looking for snakes (don’t tell him but we found one in here when we cleared the garage out).

Here’s how the work progressed:

May 26. The new garage window was installed. In the background is the new shelf unit along with a tent in the throws of being treated with silicon water-proofing.

New garage window installed today. Copyright © 2010 Gary Allman, all rights reserved.

June 14. The window is finished except for the trim. There are two coats of paint on the wall, and just one more coat to go. Ginger did most of the work painting and putting the film on the window, and Alek helped with the first coat of paint.

This window is finished except for the trim, two coats of paint on wall, just one more coat to go. Copyright © 2010 Gary Allman, all rights reserved.

June 15. The wall is all painted, and the shelves are in place. I just need to fit a couple more feet to sheet material shelf (the big long one), a couple of brackets to the top shelf, fit the garden tool pegboard and a holder for my fishing rods, and it will be done.   

The wall is all painted, and the shelves are in place. Copyright © 2010 Gary Allman, all rights reserved.

Copyright © 2010 Gary Allman, all rights reserved.

Comments