Garage Project – Just about done – For now… I’ve been tinkering with finishing this project for a few weeks now. It’s slowly getting there. Two-minute read, 5 pictures

Garage Project – Open sez-a-me. The doors are now fitted, and that’s all the main construction work complete. One-minute read, 6 pictures

Garage Project – Main storage area and the overhead shelving. One-minute read, 3 pictures

Garage Project – Ready to start building the main storage area. One-minute read, 4 pictures

Garage Project – The shop vac and compressor now have a new home. One-minute read, 2 pictures

That’s the corner cleaned up – The wall’s been patched, and the first coat of paint has been applied.

Garage Project: Getting Started With Stage IV – I forgot to take a picture before I started clearing away, so the corner to the right had already been cleared. One-minute read

Making the bed – When Ginger said “Make the bed.” I’m pretty sure this is what she had in mind. One-minute read, 5 pictures

Gary upside down with his head under the deck of a Kayak (365:221) – No it’s not very well framed, but if you think I was going to extricate myself from being jammed under the fore-deck of the kayak just to check if the darned picture was alright, you are very much mistaken.

Black and white photograph of Gary Allman using a nail gun to rpair a kitchen drawer.

Repairing a kitchen drawer – Today I repaired a kitchen drawer and in the process learned two valuable safety lessons.

Kayak storage problem solved – Now we’ve got a place to keep the kayaks, we need to put away the camping gear. Then we will be able to get the van in the garage.

No doubt Getzger is looking for snakes (don’t tell him but we found one in here when we cleared the garage out). Here’s how the work progressed … One-minute read, 4 pictures

Today I made a start on the new shelves for the garage.

Another pile of wood means… The start of Stage III of the Garage Remodel. We have to replace the window and frame too.

My new shelves all finished. 3 pictures

End of Day One – Almost Finished. 3 Pictures

Garage Project – Stage II. More shopping for lumber.

Tra-la! – The almost completed workbench, Just the pegboard, and some more shelves to add and it is finished. 4 pictures

Glued and screwed – and checking if the bench legs fit as planned – they did. 2 pictures

Getting Ready for Gluing.

Space is a bit tight – Here’s the bench laid out on the garage floor just so I can check it all fits. I’ve just got the legs for the benchtop to make now, and then it has all got to be assembled. The wall has to be painted before we can put it up too. Ginger is helping out by fixing the wall and painting it.

Building the workbench – The first thing I had to do was make a workbench so I could build the workbench. One-minute read, 2 pictures

Cleared up, ready to start – Here’s the garage with the west wall cleared ready for prepping and painting, and lots of room for me to be working in making the workbench.

Workbench Project – When we bought the minivan it became obvious that the garage would need reorganizing as it is a very tight fit. It’s almost impossible to get at any tools while the van is in the garage. 2 pictures