Problems – Three coats of paint, rubbing down between coats, around 3-4 hours each. And the color of the paint doesn’t match the doors we bought.

Painting – Time to paint the utility room shelving.

It is going to be a long day today. I left at nine and plan to be at St. Augustine’s Episcopal Church by midday. Then we have four hours to get everything ready for the four pm Celebration of Absalom Jones service. After that, break everything down and drive three hours home.

One, two, three. Testing, testing – I’m doing my first church service broadcast in almost a year tomorrow. Time to check everything still works.

Pantry shelves ready for finishing. With a lot of snow forecast, I needed to get the shelves out of the garage to make room for the car. +2

Well, that didn’t go as planned… As usual, things took a lot longer to do than I anticipated, and I made two annoying mistakes. Two-minute read.

My task for tomorrow … Is to turn this pile of wood into a ‘pantry’ and shelving unit.

Impelling – The view inside the new washer is bright, shiny, and rather sci-fi looking.

And that’s the cabinets fitted – I’ve still got to make a pantry to fill the open space on the left, and another set of shelves on the opposite side of the room too. +1

Cabinets fitted on one side. Now for the cabinets on the opposite wall.

Ginger fitting hinges – currently we are adding some high-level storage for ‘little used’ items.

Boxes – we have some work to do today. The utility room remodel is getting out of hand! We had already dealt with several boxes when I took this picture.

Final coat of stain – Made a lot of difference to the color. Now to varnish it all, add door handles, and it’s finished. +3

Making the gear closet doors – There have been a few upgrades in the workshop. Black Friday Grizzly had a drill press and bandsaw on sale at a price I couldn’t refuse. The pair cost less than the bandsaw normally retails at. The bandsaw came in particularly useful for all the joints I had to make for the gear closet doors. One-minute read, +1

Gary in the workshop – Hindsight being the gem that it is, I now know it was a huge mistake to make the doors and not get them ‘off the shelf.’ +3

Distractions – A couple of weeks before Christmas the dryer broke down. We were just about to have the utility room, painted, so Ginger decided that she’d pop out and buy a new dryer and washer for the freshly painted room. And that’s when the work began. Two-minute read, +1

Gary and Ginger, Christmas Day, 2021 – Like the shirt? I was wearing it, plus shorts, in honor of the unseasonably hot weather we were having. 2

Essential Supplies – What the Brit abroad needs.

Fronds and bottles – Testing my new cell phone’s camera in the dark. +3

Bishop Provisional of West Missouri, The Rt. Rev. Diane Bruce and the Diocesan Staff.

Gear Closet update – Still plenty left to do. Bottom shelf and kick space, shelf fronts, and … doors to make.

Back at the trailhead – Trip over, and a modest 19.15 miles hiked and 2,000 ft. of elevation climbed. Time for a shower and a beard trim! And, of course, some end of trip thoughts. Two-minute read

Another backpacking fashion show – Not. Here I am all packed up, ready to head back to the trailhead and showing off what the well-dressed backpacker is wearing nowadays. 1

Reptilian – I don’t know what this type of rock is called, but it is very reptilian in appearance.

Scroll to Top